Tuscaloosa County, Alabama Project #2511

12 MMSCFD nitrogen rejection unit using Nitech™ technology for coal mine methane application.  (Replacement due to severe tornado damage to the original facility) Project included the completion of structural skid fabrication, supply and installation of the required Nitech™ NRU interconnecting piping, valves and fittings, supply and installation of the inlet gas dehydration system, [supply and installation of a 30 GPM Diglycolamine CO2 treating facility to removal up to 2.5% of the CO2 generated by the oxygen removal and in the inlet gas] (not this project), and supply and installation of the required instrumentation including a computer based PLC control system. BCCK’s full EPC scope included field installation. The plant initially operated by BCCK Operations. (The Nitech™ process is a BCCK patented process design)